Abdul-Rahman, H, Berawi, M A, Berawi, A R, Mohamed, O, Othman, M and Yahya, I A (2006) Delay Mitigation in the Malaysian Construction Industry. Journal of Construction Engineering and Management, 132(02), 125–33.

  • Type: Journal Article
  • Keywords: Delay time; Construction management; Malaysia;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:2(125)
  • Abstract:
    This paper describes the importance of applying proper management in dealing with delays in construction for a growing economy. The main objective of this paper is to identify the management tools that are practiced in the local construction industry in mitigating delay. It also aims to identify the main factors that lead to project delays and to suggest recommendations on how to overcome or mitigate effects of the problem. Data is gathered from responses from questionnaire survey and interviews with those involved in construction project. The surveys and research findings indicate that delay incidents occur mainly during the construction phase of a project and one or more parties usually contribute to delay. This paper highlights the importance of having more experienced and capable construction managers as well as skilled laborers to enable the industry to develop at a faster rate either nationally or internationally.

Carter, G and Smith, S D (2006) Safety Hazard Identification on Construction Projects. Journal of Construction Engineering and Management, 132(02), 197–205.

Cottrell, D S (2006) Contractor Process Improvement for Enhancing Construction Productivity. Journal of Construction Engineering and Management, 132(02), 189–96.

Cox, R F, Issa, R R and Frey, A (2006) Proposed Subcontractor-Based Employee Motivational Model. Journal of Construction Engineering and Management, 132(02), 152–63.

Huang, X and Hinze, J (2006) Owner’s Role in Construction Safety. Journal of Construction Engineering and Management, 132(02), 164–73.

Huang, X and Hinze, J (2006) Owner’s Role in Construction Safety: Guidance Model. Journal of Construction Engineering and Management, 132(02), 174–81.

Ling, F Y, Ibbs, C W and Hoo, W Y (2006) Determinants of International Architectural, Engineering, and Construction Firms’ Project Success in China. Journal of Construction Engineering and Management, 132(02), 206–14.

Nepal, M P, Park, M and Son, B (2006) Effects of Schedule Pressure on Construction Performance. Journal of Construction Engineering and Management, 132(02), 182–8.

Sadeghpour, F, Moselhi, O and Alkass, S T (2006) Computer-Aided Site Layout Planning. Journal of Construction Engineering and Management, 132(02), 143–51.

Shih, N and Huang, S (2006) 3D Scan Information Management System for Construction Management. Journal of Construction Engineering and Management, 132(02), 134–42.

Telem, D, Shapira, A, Goren, Y D and Schexnayder, C J (2006) Moving a Reinforced-Concrete Building: Case Study. Journal of Construction Engineering and Management, 132(02), 115–24.

Zhang, X (2006) Public Clients’ Best Value Perspectives of Public Private Partnerships in Infrastructure Development. Journal of Construction Engineering and Management, 132(02), 107–14.